The European Union supports a major investment in water infrastructure in the Ústí nad Labem Region in north-western Czechia to enhance the local water management systems. The project, with an estimated budget of €77 million, receives support under the Public Sector Loan Facility (PSLF), combining an EU grant of €14 million with a €56 million loan from the European Investment Bank (EIB).
Severočeská vodárenská společnost, the Czech water utility company, implements the project, which focuses on modernising water infrastructure in a region undergoing a structural transformation as it moves away from its historical reliance on mining and heavy coal-based industry.
The project includes a comprehensive set of upgrades across the regional water system, including the reconstruction of water treatment plants and wastewater treatment facilities, upgrades to water distribution infrastructure, modernisation of water mains and storage reservoirs, and the elimination of untreated sewer outfalls.
The project will deliver significant social benefits by improving access to safe drinking water for approximately 300 000 inhabitants. It will strengthen public health protection through better water quality and more reliable water services.
The investment also supports the long-term economic transformation of the Ústí nad Labem coal region, contributing to a more sustainable and resilient economic model. It will improve the efficiency of water services, reduce water losses, and strengthen the overall performance of the regional water network.
In addition, the project will bring significant environmental benefits by optimising wastewater treatment processes and eliminating untreated sewer outfalls, thereby reducing pollution in local watercourses. The intervention will deliver benefits for the Bílý Potok Brook and Elbe River catchments in the Ústí nad Labem Region, improving ecological conditions and biodiversity. As these waterways also supply drinking water to Dresden in Germany, the project will generate important cross-border environmental benefits. Furthermore, the project will contribute to climate mitigation, with estimated CO₂ emissions savings of